Abstract: Combining the actual geological conditions and mining status in Weijiamao Open-pit Mine, the author calculated groundwater inflow, displacement, and designed floodway section size, floodway section parameters, floodway turning radius, floodway profile and floodway position, finally completed the floodway arrangement, which had important significance for mining and economic benefit in Weijiamao Open-pit Mine second mining area.