Construction method optimization in the landslide treatment of open-pit coal mine
露天采矿技术
Previous Articles Next Articles
Online:
Published:
露天煤矿滑坡治理中施工方法优化
Abstract:
Abstract: Taking Heishan Open-pit Coal Mine landslide for example, the author analyzes the slope stability, determines the landslide treatment measure, and optimizes the construction method. Calculation analysis shows that the method is feasible, which has important guiding significance for open-pit mine production.
摘要:
摘 要:以黑山露天煤矿滑坡为例,分析了边坡的稳定性,确定了滑坡的治理措施,并对施工方法进行了优化。计算分析表明该方法切实可行,对露天今后矿生产有重要的指导意义。
XU Guiwa.
Construction method optimization in the landslide treatment of open-pit coal mine[J]. 露天采矿技术.
徐贵娃.
露天煤矿滑坡治理中施工方法优化[J]. 露天采矿技术.