Discussion on the value of heavy rain return period in mining area
露天采矿技术
Previous Articles Next Articles
Online:
Published:
矿区暴雨重现期取值的探讨
Abstract:
Abstract: At present, the rainstorm return period values may vary from place to place all over the world. On the basis of various references, the article gives the return period value of flood control and drainage in mining area industrial plant and external road, which provides certain reference for drainage design in the project.
摘要:
摘 要:目前,世界各地对暴雨重现期的取值各有千秋。在参考各类文献基础上,给出了矿区中工业厂区与外部道路的防洪、排涝的重现期取值,对工程中关于防排水设计提供一定的参考。
HUANG Jinfen.
Discussion on the value of heavy rain return period in mining area[J]. 露天采矿技术.
黄金芬.
矿区暴雨重现期取值的探讨[J]. 露天采矿技术.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.ltckjs.com/EN/
https://www.ltckjs.com/EN/Y2016/V31/I8/68