Reconstruction of boiler flue gas system in Shengli East No.2 Open-pit Mine industrial field
露天采矿技术
Previous Articles Next Articles
Online:
Published:
胜利东二露天煤矿工业场地锅炉烟气系统改造
Abstract:
Abstract: According to the emission status of boiler room flue gas and boiler operation characteristics in Shengli East No.2 Open-pit Mine industrial field, the mine carries out reconstruction from desulphurization and denitration, dust removal three aspects in terms of the local environmental monitoring data and standard. According to the calculated efficiency and site area, investment and many other factors, the mine comprehensively chooses the suitable process and equipment of this project.
摘要:
摘 要:针对胜利东二露天煤矿工业场地锅炉房烟气的排放现状及锅炉运行特点,依照当地环保监测数据及标准,分别从脱硫、脱硝、除尘3方面进行改造。根据计算所需的效率及场地面积、投资等多个因素,综合选择了适合本工程的工艺方法及设备。
WANG Aiai.
Reconstruction of boiler flue gas system in Shengli East No.2 Open-pit Mine industrial field[J]. 露天采矿技术.
王爱爱.
胜利东二露天煤矿工业场地锅炉烟气系统改造[J]. 露天采矿技术.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.ltckjs.com/EN/
https://www.ltckjs.com/EN/Y2016/V31/I8/61