露天采矿技术

Previous Articles     Next Articles

Application of RCC dam project in Shengli East No.2 Open-pit Coal Mine

  

  • Online:2016-05-15 Published:2016-05-10

碾压筑坝方案在胜利东二号露天煤矿的应用

  

Abstract:

Abstract: Shengli East No.2 Open-pit Mine adopts cleaning slip RCC dam method to control landslide of stope south slope and recovery coal. The article introduces the calculation process and construction steps of the scheme. Through implementing the scheme, the mine not only improves the slope stability, but also creates the double benefit of safety economy.

摘要:

摘 要:胜利东二号露天煤矿,可采用清滑碾压筑坝方法治理采场南帮发生的滑坡,回采煤炭。详细介绍了该方案的计算过程及施工步骤,通过实施该方案,不仅可提高边坡稳定性,还可创造安全经济双效益。