Implementing "peak hide" to decrease cost and increase benefit in open-pit coal mine

  

  • Online:2016-04-15 Published:2016-04-25

露天煤矿实施“躲峰填谷”降本增效

  

Abstract:

Abstract: Combining the actual production conditions of Yuanbaoshan Open-pit Coal Minev, the mine implements "peak hide" and the policy of energy conservation and emissions reduction, reasonably arranges work time and saves electricity costs. During the peak hide, the mine strengthens the equipment maintenance, maintenance, and ensures the working efficiency, which reduces operating costs and improves production benefit.

摘要:

摘 要:结合元宝山露天煤矿实际生产情况,实施 “躲峰填谷”、节能减排的政策,合理安排作业时间,节约用电成本。在躲峰期间加强设备维护、保养、检修的力度,保证作业效率,从而减少作业成本,提高企业生产效益。