露天采矿技术
• 采矿工程 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
摘要:
摘 要:针对抚顺西露天东区开采14段站北移设工程作业过程进行介绍,主要根据从经济和技术的角度对14段站北移设工程进行了分析和探讨,并提出了合适的开采方案.
Abstract:
Abstract: This article introduces the operation process of 14 stage station north shift project in the eastern area of Fushun West Open-pit mine. From the economy and technology aspect, the author analyzes and discusses 14 stage station north shift project and presents the suitable mining scheme.
尹有德. 抚顺西露天矿东区开采14段站移设工程[J]. 露天采矿技术.
YIN Youde. 14 stage station shift project in the eastern area of Fushun West Open-pit Mine [J]. 露天采矿技术.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.ltckjs.com/CN/
https://www.ltckjs.com/CN/Y2016/V31/I11/16