Fushum East Open-pit Mine adopts the railway dumping technology to dump, and its internal dump site is located in West Open-pit Mine mining boundary, which is respectively the eastern dump and western dump. In May 2014, West Open-pit Mine north slope emerges rib spalling slipping, which causes the dumping ability to sharply decline in East Open-pit Mine internal dump. According to the total dumping amount, the author presents the planning and construction scheme of the internal dump to solve the excessive dumping pressure problem.
摘要:
抚顺东露天矿排土主要采用电铁排土工艺,其内排土场位于抚顺矿业集团西露天矿开采境界内,分别为东区排土场及西区排土场。2014年5月,西露天矿北帮出现片帮滑落,造成东露天矿内排土场的排土能力突然大幅下降。根据排土总量提出内排土场规划建设方案,解决东露天矿排土压力过大的问题。
LU Bing, CHEN Jiwang, SUN Kai, MA Zhilong. Long term development plan of internal dump in Fushun East Open-pit Mine[J]. 露天采矿技术, 2015, 30(12): 15-.
鲁 冰,陈吉望,孙 凯,马志龙. 抚顺东露天矿内排土场长远发展规划[J]. 露天采矿技术, 2015, 30(12): 15-.