Abstract: Taking the compilation of soil and water change conservation plan in Daqiang Coal Mine as an example, this article introduces the available reference from the aspects of determining the range of responsibility , soil erosion prediction、determining the control goal, setting prevention measures, preparing the investment estimate, etc.
摘要:
摘 要:以大强煤矿变更水土保持方案的编制为例,从防治责任范围的确定、水土流失预测、防治目标确定、防治措施布设及投资概算编制等方面介绍了可供参照的做法。
CHEN Dong. Writing ideas of conservation scheme on change of soil and water in Daqiang Coal Mine construction project[J]. 露天采矿技术.
陈 东. 大强煤矿建设项目变更水土保持方案编写思路[J]. 露天采矿技术.