露天采矿技术 ›› 2015, Vol. 30 ›› Issue (12): 1-.
Next Articles
Online:
Published:
Abstract:
The outward transportation way is mainly train shipment in 10.0 Mt/a ground production system preliminary design of Tianchi Energy South Open-pit Coal Mine (design capacity of 5 000 t/h). By unloading the plough unloader for train loading station on the tape machine in the existing ground production system loading technology, the mine can release material and optimize the loading process.
摘要:
新疆天池能源南露天煤矿一期10.0 Mt/a地面生产系统初步设计中外运方式以火车装运为主(设计能力5 000 t/h),通过对现有地面生产系统装车工艺中为火车装车站上料胶带机中部增设犁式卸料器进行卸料,用以释放存料,优化了装车工艺。
GUO Jin, QIAO Long, WU Yidong. Ground production system loading technology optimization in Tianchi Energy South Open-pit Coal Mine[J]. 露天采矿技术, 2015, 30(12): 1-.
郭 金,乔 龙,吴义东. 天池能源南露天煤矿地面生产系统装车工艺优化[J]. 露天采矿技术, 2015, 30(12): 1-.