通过整体排土规划及搭桥节约运距

  

  • 出版日期:2016-01-15 发布日期:2016-01-18

Reducing transportation distance through the whole dumping plan and bridge

  • Online:2016-01-15 Published:2016-01-18

摘要: 摘 要:哈尔乌素露天煤矿通过整体排土规划,计划北部剥离量走北端帮,排至排土场北部;中部1025及以下平盘走中间桥,排至排土场中部;采场南部剥离量走南端帮,排至排土场南部。通过搭接中间桥、端帮排土桥,最大限度节约排弃运距。

Abstract: Abstract: Through the whole dumping plan, Haerwusu Open-pit Coal Mine plans the northern stripping quantity moving north end slope to the dump north . The middle 1025 and below 1025 flat goes through middle bridge to the dump middle. Through lapping middle bridge and end slope dumping bridge, the mine saves the abandoned transportation distance in maximum.